Handyman quoted one flat day rate for six small jobs — how do I tell whether that is fair?
The list is: a running toilet, a door that needs rehanging, three shelves put up, one light switch swapped, a window reseal and two plaster holes patched. He has quoted a single day plus materials and reckons it is all doable between eight and four. I have no other quotes yet and no feel at all for what a day of someone's time should cost. What would you check before saying yes?
@shallow_well_shea · last mo. · 3 replies
I price this kind of day for a living, so here is what is inside that number: my time, the van and its fuel and insurance, public liability insurance, the tools, the trip to the merchants that always happens, the waste I take away, and the half day of quoting and admin that nobody pays for directly. A day rate is not an hourly rate times eight; it is a whole day I cannot sell to anyone else, including the parts where I am driving. Whether the number is fair is a local question, but the way to test it is to get two more quotes for the identical list and expect the middle one to be about right.
Reply
Report
@porosity_nerd · last mo.
The trip to the merchants is the honest bit most homeowners never account for. If you buy the materials yourself in advance and have them in the hall, that alone can take a chunk out of the day.
Reply
Report
@threeleggedcat · last mo.
Buying the materials myself had not occurred to me. Presumably I need to check with him what exactly to get so I do not buy the wrong shelf brackets.
Reply
Report