Is it normal for a first soldered build to take six hours Build Help
65 percent kit, 68 switches, through hole diodes already populated thankfully. Six hours across two evenings, and nothing went wrong at all. It works, it looks fine, no bridges. But I kept stopping to re read instructions and inspect joints, and I watched a build video afterwards where the guy did the whole thing in about forty minutes. I want to know whether I am slow or whether the video is the outlier.
@blown_cap · 2w ago · 3 replies
Four to eight hours is completely normal for a first build. The videos are people who have done thirty of them, with the parts already sorted, editing out the boring parts.
Where your time actually went, roughly: switch soldering is 136 joints and at a genuinely careful pace that is an hour and a half. Stabilisers, if you tuned them, is another hour on a first attempt. Testing and inspecting is where beginners spend the rest, and that is time well spent.
An order that saves an hour next time. Test the PCB with tweezers before soldering anything. Do the stabilisers completely, and test them by hand, before any switch goes in, because reaching a stab under installed switches is miserable. Put in the four corner switches, snap the plate on, check it is square, then solder those four, then the rest. Flash the firmware before you install every keycap.
Second build will be two hours. Third will be ninety minutes and you will stop counting.
Reply
Report
@leech_wrangler · 3w ago
Tweezer testing the PCB before soldering had not occurred to me at all. Adding all of this to a note for the next one.
Reply
Report
@secondhandamps · 3w ago
Doing stabs first is the biggest single time saver on the list. I ignored that advice once and spent forty minutes with tweezers and a lot of swearing.
Reply
Report