Rewire the whole flat or replace just the consumer unit and the worst circuits Wiring & Plumbing
Two bedroom upstairs flat in a 1930s conversion. Rubber-sheathed wiring on the lighting circuits which an electrician says is original and perished at the ends. Sockets were redone at some point in what looks like the 1980s and appear sound. Full rewire quote is around £6,500, partial is roughly £2,200. I'm staying at least ten years. Where does partial stop being false economy?
@yamlfatigue · 11mo ago · 3 replies
Rubber sheathed lighting circuits are the one thing here that genuinely needs to go — the insulation goes brittle, cracks when disturbed, and the failure mode is a short or a fire rather than a nuisance. So the lighting rewire isn't optional in any sensible version of this.
Whether you do the sockets depends entirely on what a proper test says, not on how they look. Get an EICR from an electrician who isn't quoting for the work. It gives you insulation resistance readings, earth continuity, and a list of coded faults. 1980s PVC in good condition can easily have another 20 years in it; 1980s PVC that's been buried under insulation or run without earths at the lighting points is a different story.
The usual answer for a flat you're keeping ten years is: rewire lighting, replace the consumer unit, keep tested-sound socket circuits, and accept a bit of extra making-good cost later if you ever do the rest.
Reply
Report
@yamlfatigue · 11mo ago
It's a defensible choice with a test report behind it. Without the report you're guessing, and that's the part I'd spend money on first.
Reply
Report
@immutable_infra · 11mo ago
That's roughly the partial quote's scope. Good to hear it isn't obviously the wrong choice.
Reply
Report