Ask
152
@bootstrap_nadia ·

I shipped v1 three weeks ago and nobody noticed — what is the difference between releasing it and launching it?

The product is live, billing works, six people use it, five of whom I know. I put up a post, told two group chats, got about 40 visits, and that was apparently the whole event. I keep reading about launches as if they are a thing you do rather than a day the software becomes available, and I genuinely cannot tell what the extra part consists of. I have two weeks of evenings before a quiet period at work ends. What is actually in a launch that is not in a release?

9 answers Share
Report

Answering anonymously — a moderator will review it first.

  • @retainer_rue · last mo.

    Numbers from mine so you can calibrate. I spent seven weeks collecting a list, ended with 610 addresses, and on launch day 244 opened the mail and 96 clicked. That plus a directory post and one newsletter mention produced 2,900 visits in 48 hours and 71 signups, of which 9 paid within a month. The same product, released quietly four months earlier to nobody, had produced 3 signups in total. The delta was entirely the list, not the software.

    108
    Share
    Reply

    Answering anonymously — a moderator will review it first.

    Report
  • @sashcord_stu · last mo. · 3 replies

    A release is a state change in your deployment. A launch is an appointment you make with an audience you assembled in advance, and if you did not assemble one, there is nothing to launch to. Concretely, the assembly is the boring part: four to six weeks of talking to people in places where your users already are, collecting a list of anyone who says that sounds useful, and telling them a date. Then on the day, the thing you are doing is not publishing, it is contacting several hundred people who already agreed to hear from you, all within a few hours, so that everything that happens next looks like momentum to everyone else. You have not skipped the launch, you have skipped the six weeks before it.

    141
    Share
    Reply

    Answering anonymously — a moderator will review it first.

    Report
    • @bootstrap_nadia · last mo.

      So the launch is the last two percent of the work and I did only the last two percent. That is bleak and clarifying.

      43
      Share
      Reply

      Answering anonymously — a moderator will review it first.

      Report
    • @retainer_rue · last mo.

      It also means the date is arbitrary and moveable. Pick it when the list is big enough, not when the code is.

      31
      Share
      Reply

      Answering anonymously — a moderator will review it first.

      Report
  • @thebigwhy · last mo. · 3 replies

    I want to gently disagree with the whole shape of this. For a B2B tool with a narrow audience, launch day theatre mostly buys you a spike of people who will never pay, and I have watched three friends get a great launch day and no business. My own product went from zero to a livable revenue with no launch at all, just twelve months of answering questions in the places my users already asked them. If your audience is a few thousand people worldwide, you do not need a day, you need to become a fixture. Spend the two weeks on outreach that continues after week two.

    79
    Share
    Reply

    Answering anonymously — a moderator will review it first.

    Report
    • @beatriz_moll · last mo.

      This is right for narrow B2B and wrong for anything with a broad consumer surface, and the disagreement usually comes down to people generalising from their own market. Worth the original poster saying which they are.

      46
      Share
      Reply

      Answering anonymously — a moderator will review it first.

      Report
    • @bootstrap_nadia · last mo.

      Mine is somewhere in between, which probably means I should be doing the sustained version and treating a launch day as optional.

      22
      Share
      Reply

      Answering anonymously — a moderator will review it first.

      Report
  • @invoice_chaser · last mo.

    I did the version where you skip the list and it went exactly as you would expect. Big coordinated day, 900 visits, three directories, one moderately viral post, and zero signups, because the visitors had no context and no reason to care and I had no way to contact any of them again. The single change that would have fixed it was an email capture on the page from day one, so at least the 900 would have been reachable a second time.

    71
    Share
    Reply

    Answering anonymously — a moderator will review it first.

    Report
  • @egress_egon · last mo.

    Release is a deploy. Launch is a date plus a list plus a reason for the date. You have a deploy.

    55
    Share
    Reply

    Answering anonymously — a moderator will review it first.

    Report